Thursday, September 10, 2009

Last CSGA Ride of the season party!

Monday, Sept. 14th is the last day to ride at Cannonsburg State Game Area for the year. Come on out and do a lap or several. This "group ride" will have no structure, just individuals or small groups out riding at their own pace. When it gets dark, come on out to the after party which will be just up the road at my house. Weather looks like it will be perfect for a bon fire! Of course there will always be records spinning in the bike barn too. Brats and hot dogs will be provided but there is plenty of room on the grill if you have something specific you want to bring to grill (like a veggie burger for example). BYOB and maybe some chips or something if you feel like it. You can even try your hand at scratching records and wear the gold chain if you want-
Cramer
Directions to after party - Drive toward Cannonsburg Ski Area, turn north on Myers Lake road about 1/2 mile, then right (east) on Kreuter another half mile to 7101 Kreuter. Party starts when it gets to dark to ride without lights.

Saturday, August 29, 2009

Luton Park....Black Loop


The new Black Loop is open for riding at Luton Park. The 2.7 mile trail is similar to the Red Loop. It is all signed and arrowed and you will find the entrance on your right just after the first bridge (if you are starting at the barn). It will wind and loop all over the northeast corner of the property, cross the Blue Trail once and dump you out right near the same bridge. We have one large log pile option to create and quite a few bench cuts to put in but it is all ride able, enjoy! With all the loops complete, the trail system now totals 9.3 miles. The largest mountain bike trail system in Kent County.


Please remember to let the trails at Luton Park dry for at least two days after it rains. Currently (8-29-09) the Blue Loop and portions of the Yellow and Orange have large muddy sections that are growing by the day as people tend to try riding around them. If you encounter mud puddles it is best to ride straight through them so the trail will not get wider.

Tuesday, August 25, 2009

Late notice: Luton trail day 8-26-09, 6pm

Meet at the Luton Barn at 6pm tomorrow night (Wednesday 8-26-09) and we will try to get the Black Loop open. I have counted over 130 saplings to dig out of the trail tread and 1.5 miles of the loop still needs to be raked. Need to run a string trimmer in a few areas as well. We have 9 Pulaski's or weed wrenches to dig saplings out, a string trimmer and 7-8 hard rakes available. With a good turnout I bet we could open it for riding. With the game area closure just around the corner and this park remaining open during hunting season it sure would be nice to have this loop rideable. Hate to have it sit all winter. Let me know if you can help so I can get a head count for tools.
Thanks
Rick

Wednesday, August 12, 2009

Workdays: Owassipe 8/16, Robinette's 8/22, Luton 8/23

This trail day will begin at 10am and last until at least 6. Some of you have worked with us before and so the drill is pretty much the same. Here's what we'll need to do; General trail maintenance and cleanup. The Scouts usually leave quite a mess just because they don't mind climbing over fallen trees. There will be several crews established for different jobs. This will be assigned during the pre-work meeting at the trailhead. New Trail:Some of the bigger jobs may include routing a new trail to replace the part of the Blue that crosses Camp Gerber property. This was in the fine print of the new terms that Matt V had to agree to. We just didn't need to worry about it when the trails were last open prior to Scout Camp.Ranger Al's Special Needs Crew: A very positive benefit for all trail users is keeping Al happy. This crew will be doing this most important job. Usually it's small jobs around camp. New Sign Crew: There will be at least one new sign at the trailhead parking area. Jim Samlow is building it currently and this will need painting for a shiny, new look. This will be the main bulletin board to be used for all trail users. It will be vastly more informative and useful than the old one. It will facilitate the new waiver system that is mandatory. There will also be new signage out on the trail. All these new signs were paid for through a donation by the W.MI Coast Riders Bike Club. Recommended Work Accessories: Bring your bike if you can. Be dressed more for a work day than a riding day. Bring any handy work tools. Small and/or folding saws, gloves, any small container for carrying paint and a small brush please. Trail crews will be asked to remark the blue or red trails as needed. I have the paint. A leaf or garden rake and hand clippers is a good idea, too. Basically, you all know what a clean trail looks like. Just consider this and bring what you've got. Also, please bring your own food and drink. the lunch budget was reallocated into the sign budget!Your Reward: Besides a making a great trail even better, you will be credited with half off the annual $60 pass. The new trail use terms have extended our riding and hiking season. This makes it a better deal than the old days. Please call or email with any questions! Happy Trails, Bryan Myers cell:231-557-3396

Robinettes: 8/22/09 9:00 am, trim trail and open new section!
Luton Park: 8/23/09 9:00 am, rake, bench cut and trim open 3 mile black loop

Friday, August 7, 2009

Luton Park Trail Day this Saturday August 8th, 9am

POSTPONED UNTIL AUGUST 23RD...APPROACHING HEAVY THUNDERSTORMS COULD BE VERY DANGEROUS WITH ALL THE WIDOWMAKERS AT LUTON PARK. Join us for another trail day on August 8th at 9:00 am. Meet at the Luton Barn on Kies Ave. Help us cut new trail. Currently we are about 2/3 of the way through the Black Loop (previously stated as the White loop). Chapter tools provided but we could use additional rakes for the day. Come rain or shine. With a good turnout we should be able to open this loop!

Tuesday, August 4, 2009

WMMBA Meeting Minutes - August 3, 2009

Western Michigan Mountain Biking Association

Meeting Minutes

Date: August 3, 2009

Location: Mangiamo Restaurant – 2nd Floor, Grand Rapids, MI

Board Members Present: Rick Plite - President, Martin Hall-Treasurer, Nate Phelps-State Representative, Jennifer Bechtel – Secretary

Total Attendence: 5 members, 1 guest, 3 board members

Start time: 6:30 p.m.

---------------------------------------------------------------------------------------------------

Meeting called to order at 6:34 p.m. – Rick Plite

---------------------------------------------------------------------------------------------------

Minutes recap from June 1, 2009 – Rick Plite

---------------------------------------------------------------------------------------------------

BikeStock Recap – Rick Plite

Was held last Saturday in Grand Rapids.

WMMBA had a membership table and acquired 8 new members. WELCOME!

Raffled off a donated Giant bike.

---------------------------------------------------------------------------------------------------

Jason Schwab has linked-up our blog spot to Facebook and Twitter. – Rick Plite

Just a reminder that the blog spot is available to all board members to write a story, make a post. More updates = more readers.

---------------------------------------------------------------------------------------------------

Stanaback Park Meeting – Rick Plite

City of Kentwood approached us about putting mountain bike trail on this 40 acres.

Location is 36th and Breton in Kentwood.

---------------------------------------------------------------------------------------------------

Gezon Park trail possibility – Rick Plite

Nate & Dennis met with Chad Root to consider putting in mountain bike trails at Gezon Park in Wyoming, MI.

---------------------------------------------------------------------------------------------------

State Games of Michigan Coming 2010 – Rick Plite

Put on by West Michigan Sport Commission next June.

Committee members in place. Contact Rick if interested in joining committee to design the type of race and location.

---------------------------------------------------------------------------------------------------

Yankee Springs Time Trial Committee – Rick Plite

Looking for Committee members for the 2010 race

Third Sunday in April

---------------------------------------------------------------------------------------------------

MidWest Mountain Bike Summit Committee – Rick Plite

Current members include Nate, Jason, and Aaron. Need 3-4 others!!

---------------------------------------------------------------------------------------------------

Brown County Indiana Bike Trip – Rick Plite

Had a great trip on a great trail system during July 18th bike trip.

Planning chapter trip to there again the weekend of Oct 23rd – 24th

6.5 hr drive. Plan full three-day weekend.

Have cabins, lodge, indvl. Rooms, nice restaurants in the area.

---------------------------------------------------------------------------------------------------

NCT Epic Trail Event – Rick Plite

October 9th – 11th

$145/person which includes everything, even the Founders.

A certified medic/mechanic will be the sweep this year.

Four spots still available!

---------------------------------------------------------------------------------------------------

Halloween Party Planned – Rick Plite

Possible location – Mill Creek Tavern in Comstock Park with band

---------------------------------------------------------------------------------------------------

Film Festival – Nate Phelps/Rick Plite

In conjunction with the Rapid Wheelman

January/February time frame.

Already have first film lined up.

---------------------------------------------------------------------------------------------------

14.0 Treasury Report – Martin Hall

14.1 Currently at a low point in funding, especially in terms of planned activities.

14.3 We need fresh ideas for how to fund all these great activities!

---------------------------------------------------------------------------------------------------

State Report – Nate Phelps

Funding is looking good for the MMBA overall due to spending less over the last few years. Individual chapters encourage to apply for grants from MMBA for local projects.

33% drop in membership. Will return to paper reminders, in addition to 90, 60, 30 day email reminders to renew.

Next Bent Rim Bugle will be last paper version. New pdf version will be in full color and longer. The February issue will still be print version each year.

Proposing an Advocacy Committee which will include hiring a part-time lobbyist to have a presence in Lansing. Possibly also a grant writer.

Looking at more non-race events at the State level.

Annual meeting will be inside this year. Either Lansing or Battle Creek. Looking for a facility that will allow bringing in dirt to create a pump track.

---------------------------------------------------------------------------------------------------

16.0 Green Grand Rapids Update – Nate Phelps

16.1 In October, the final event is to present the five year Master Plan for the City of Grand Rapids which includes the Recreation Master Plan.

16.2 Nate has pushed for the opportunity for Greenspace and single track in City Parks.

---------------------------------------------------------------------------------------------------

Bicycle Friendly Community Update – Nate Phelps

Part I was in April. Part II will be submitted this week.

Trying for a bronze level, to be updated each year.

City planners are considering the statistics showing more people move to cities that have bicycle-friendly communities.

---------------------------------------------------------------------------------------------------

Trail Coordinator Reports

Luton – Rick Plite: Trail day this Saturday (Aug 8th) to rake and cut out stumps. Had couple more trail days and now the black loop (previously white loop) adds 3 miles. Will have 9.3 miles when completed.

Ski Area – via Rick Plite: Met w/Ski Area reps and major changes include

Please, DO NOT ride across bridge nearest dumpster. That is for their maintenance vehicles and the blind corner creates a hazard.

Do not ride up the double-chair hill (trying to prevent erosion).

Do not use the gate in/out of Egypt Valley Rd.

Please follow signs that have been built, purchased, and put up.

Robinette’s – Glen: August 22nd trail day when will extend on the north side.

The Robinette’s have been brush-hogging. Arrows have been put up.

Ionia – Guy: Please do not do work out there without notifying Guy first so he can contact DNR to let them know you will be out there.

DNR working on creating a Rails-to-Trails out there that would allow going around the swampy area (old trash dump and archeological site). Possibly next summer.

A reminder that Trail Coordinators who need to rent additional equipment for spring clearing can request extra funds above their current limit.

---------------------------------------------------------------------------------------------------

18.0 Attendence at Meetings – Martin Hall

18.1 Seeking input to increase attendance at these meetings. Decision was made to market more effectively by repeating invites on Facebook and also emailing chapter members.

18.2 Need location that is quiet, non-smoking, serves food/alcohol.

18.3 Jason S. noted Twitter/Facebook users can opt-in to receive text messages to see when our pages are updated.

---------------------------------------------------------------------------------------------------

19.0 Next meeting: October 5, 2009 –Mangiamos

---------------------------------------------------------------------------------------------------

20.0 Motion to adjourn – Martin Hall. Nate Phelps seconded. Motion passed.

18.1 Meeting Adjourned at 7:31 p.m.

---------------------------------------------------------------------------------------------------

These minutes to be posted at:

http://westernmmba.blogspot.com/

http://www.facebook.com/home.php#/pages/Grand-Rapids-MI/westernMMBA/

Cannonsburg Ski Area requests

I recently met with the Ski Area management they have a requested a few changes in regards to riding on their property. They have asked me to post them up here.
#1 Please enter and exit the Ski Area property via the bridge located near the main lodge. The bridge near the maintenance building is now closed to foot or bike traffic. A couple reasons for this, the machinery in this area is dangerous and they use this bridge for vehicle traffic. They have had a few close calls with riders bombing over the bridge and nearly having head on collisions.
#2 Due to erosion, please don't ride up and down the ski slopes. Stay on designated bike trails only.
#3 Also due to erosion, the red gated entry off Egypt Valley Road is now closed to bike traffic. Please enter the property at the main driveway on Cannonsburg Road.
#4 Do not ride during the evening of Picnic Pops (5pm-11pm) every Thursday and Friday during July
They will be posting signs with all the changes and moving the Trail Head Sign to a more prominent location. I know habits are hard to break but these rules come at the request of the Ski Area and we are their guests. This is private property after all. Please spread the word so we can continue to enjoy the trails!

Monday, July 27, 2009

Cannonsburg Trail Day this Sunday, Aug 2nd

Join us for a trail day at the Cannonsburg Ski Area from 9am-1pm. We will do light trail work on the xc trails and the skills park trails. Maybe some rock armoring on the springs located on the creek trail. Bring loppers, gloves, bug spray and water, all other tools provided. Lunch provided! Rain or shine.

Tuesday, July 14, 2009

State Games of Michigan

The Western Chapter is pround to announce that we will be holding a mountain bike race in West Michigan in conjuction with the State Games of Michigan June 25-27th 2010!

Sunday, July 12, 2009

LUTON RECAP

Thanks to everyone that came out today! The 16 volunteers racked up another 60 man hours by cutting another mile or so on the new Black Loop. I would guess we have another mile to go until we reach the end of the loop and then all the bench cutting and fine tuning begins. Building all these trail is tough work and takes time but these trail will be here for years to come and everyone should be proud to be a part of them. A special thank you to Jody's Restaurant for the delicious wraps and to Jody Beard for the chocolate chip cookies! Stop in for lunch or dinner after a ride sometime.



We will hold another trail day on August 8th at 9am, come on out and help us cut open the remaining section!